Paper detail

A Framework for Risk Assessment and Optimal Line Upgrade Selection to Mitigate Wildfire Risk

As wildfires in the United States are becoming more frequent and severe, mitigating wildfire ignition risk from power line faults is an increasingly crucial effort. Long-term ignition prevention strategies, especially converting overhead lines to underground cables, are expensive. Thus, it is important to prioritize upgrades on lines that will reduce wildfire ignition risk the most. However, since so many factors contribute to ignition risk, it is difficult to quantify the wildfire risk associated with power lines. This paper examines how various risk definitions based on historical wildfire risk maps can be used to inform transmission upgrade planning. These risk metrics are evaluated using an optimization model that determines which overhead lines should be undergrounded such that the total wildfire risk in the network is minimized. The risk assignment and upgrade selection are tested on both a synthetic network and the actual transmission lines in California.

preprint2022arXivOpen access
0citations
0reviews
0saves
Nocode
Nodataset
0institutions

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.