A 2.542-Approximation for Precedence Constrained Single Machine Scheduling with Release Dates and Total Weighted Completion Time Objective

We present a $\sqrt{e}/(\sqrt{e}-1)$-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The previously best known approximation algorithm dates back to 1997; its performance guarantee can be made arbitrarily close to the Euler constant $e$.

preprint2016arXivOpen access

Signal facts

What is known right now

Open access1 author2 topics

Next steps

Decide what to do with this paper

Use like or dislike for the fast social read. The more specific scholarly feedback stays available below when needed.

Log in to curate

Reading frame

Keep the important context close to the paper

Keep the important signals around this paper in one place: votes, save state, collection context, reviews and the metadata you need before deciding what to do next.

Institutions

Add specific reaction

Move through the context

Research map

Open full explorer

Move through nearby people, institutions, topics and adjacent work without leaving the paper page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Structured reviews

0 review(s)

ContributeLeave structured feedbackUse the review template when you have a concrete strength, concern or method question.Open review form

No structured reviews yet. High-signal critique starts here.

Work discussion

0 comment(s)

DiscussAdd a high-signal commentKeep quick notes, caveats and replication pointers separate from formal reviews.Open comment form

No discussion yet. The first strong comment sets the tone.