Researcher profile

Zuxun Xiong

Zuxun Xiong contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 11 - UnverifiedVerification L1Unclaimed author
1works
0followers
2topics
3close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2022arXiv

A Stochastic Planning Method for Low-carbon Building-level Integrated Energy System Considering Electric-Heat-V2G Coupling

The concept of low-carbon building is proposed to ameliorate the climate change caused by environmental problems and realize carbon neutrality at the building level in urban areas. In addition, renewable energy curtailment in the power distribution system, as well as low efficiency due to independent operation of traditional energy systems, has been addressed by the application of integrated energy system (IES) to some extent. In this paper, we propose a planning method for low-carbon building-level IES, in which electric vehicles (EV) and the mode of Vehicle to Grid (V2G) are considered and further increase the flexibility of low-carbon buildings. The proposed planning model optimize the investment, operation costs and CO2 emission for building-level IES, so as to achieve the maximum benefit of the construction of the low-carbon building and help the realization of carbon neutrality. Moreover, we consider the uncertainty of distributed renewable energy, multi-energy load fluctuation and the random behavior of EV users, then formulating a two-stage stochastic programming model with chance constraints, in which heuristic moment matching scenario generation (HMMSG) and sample average approximation (SAA) method are applied. In case study, a real IES commercial building in Shanghai, where photovoltaic (PV), energy storage system (ESS), fuel cell (FC), EV, etc. are included as planning options, is used as numerical example to verify the effectiveness of the proposed planning method, with functions of ESS and EV in IES are analyzed in detail in different operation scenarios.