Source author record

Zhicheng Zhu

Zhicheng Zhu appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
2topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2020arXiv

Condition-based Maintenance for Multi-component Systems:Modeling, Structural Properties, and Algorithms

Condition-based maintenance (CBM) is an effective maintenance strategy to improve system performance while lowering operating and maintenance costs. Real-world systems typically consist of a large number of components with various interactions between components. However, existing studies on CBM focus on single-component systems. Multi-component condition-based maintenance, which joins the components' stochastic degradation processes and the combinatorial maintenance grouping problem, remains an open issue in the literature. In this paper, we study the CBM optimization problem for multi-component systems. We first develop a multi-stage stochastic integer model with the objective of minimizing the total maintenance cost over a finite planning horizon. We then investigate the structural properties of a two-stage model. Based on the structural properties, two efficient algorithms are designed to solve the two-stage model. Algorithm 1 solves the problem to its optimality and Algorithm 2 heuristically searches for high-quality solutions based on Algorithm 1. Our computational studies show that Algorithm 1 obtains optimal solutions in a reasonable amount of time and Algorithm 2 can find high-quality solutions quickly. The multi-stage problem is solved using a rolling horizon approach based on the algorithms for the two-stage problem.