Researcher profile

Zhao Yuan

Zhao Yuan contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 19 - UnverifiedVerification L1Unclaimed author
5works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

5 published item(s)

preprint2022arXiv

Integrated routing for a vehicle-robot pickup and delivery system with time constraints

This paper considers an unmanned vehicle-robot pickup and delivery system, in which a self-driving vehicle carrying multiple unmanned robots in the form of the mother ship travels from a depot to a number of stations distributed in a neighborhood to perform multiple pickup and delivery services. First of all, we present it as a Multi-modal Vehicle Routing Problem (MMVRP) with time constraints, which are typical service requirements for grocery and food delivery in practice. We then formulate it as a Mixed Integer Quadratically Con-strained Program (MIQCP) model to determine the optimal integrated routing plan (vehicle routing and robot routing) to minimize the total weighted tardiness of all services. Finally, a small-size and a medium-size problem instance are solved using the Gurobi solver in Python to demonstrate the validity and the performance of the proposed MIQCP model.

preprint2022arXiv

Real-time decision-making for autonomous vehicles under faults

This paper addresses the challenges of decision-making for autonomous vehicles under faults during a transport mission. A real-time decision-making problem of vehicle routing planning considering maintenance management is formulated as an optimization problem. The goal is to minimize the total time to finish the transport mission by selecting the optimal workshop to conduct the maintenance and the corresponding routes. Two methods are proposed to solve the optimization problem based on two methods of fundamental solutions: (1) Mixed Integer Programming; (2) Dijkstra's algorithm. We adapt these methods to solve the optimization problem and consider improving the computation efficiency. Numerical studies of test cases of highway and urban scenarios are presented to demonstrate the proposed methods, which show the feasibility and high computational efficiency of both methods.

preprint2020arXiv

Optimal Provision of Concurrent Primary Frequency and Local Voltage Control from a BESS Considering Variable Capability Curves: Modelling and Experimental Assessment

This paper proposes a control method for battery energy storage systems (BESSs) to provide concurrent primary frequency and local voltage regulation services. The actual variable active and reactive power capability of the converter, along with the state-of-charge of the BESS, are jointly considered by the optimal operating point calculation process within the real-time operation. The controller optimizes the provision of grid services, considering the measured grid and battery statuses and predicting the battery DC voltage as a function of the current trajectory using a three-time-constant model (TTC). A computationally-efficient algorithm is proposed to solve the formulated optimal control problem. Experimental tests validate the proposed concepts and show the effectiveness of the employed control framework on a commercial utility-scale 720 kVA/560 kWh BESS.

preprint2020arXiv

Properties of Convex Optimal Power Flow Model Based on Power Loss Relaxation

We derive the branch ampacity constraint associated to power losses for the convex optimal power flow (OPF) model based on the branch flow formulation. The branch ampacity constraint derivation is motivated by the physical interpretation of the transmission line Π-model and practical engineering considerations. We rigorously prove and derive: (i) the loop constraint of voltage phase angle, required to make the branch flow model valid for meshed power networks, is a relaxation of the original nonconvex alternating current optimal power flow (o-ACOPF) model; (ii) the necessary conditions to recover a feasible solution of the o-ACOPF model from the optimal solution of the convex second-order cone ACOPF (SOC-ACOPF) model; (iii) the expression of the global optimal solution of the o-ACOPF model providing that the relaxation of the SOC-ACOPF model is tight; (iv) the (parametric) optimal value function of the o-ACOPF or SOC-ACOPF model is monotonic with regarding to the power loads if the objective function is monotonic with regarding to the nodal power generations; (v) tight solutions of the SOC-ACOPF model always exist when the power loads are sufficiently large. Numerical experiments using benchmark power networks to validate our findings and to compare with other convex OPF models, are given and discussed.

preprint2020arXiv

s-Vector Control of Battery Energy Storage System: Definition and Application

We give the definition of s-Vector control by using the complex power vector in the p-q plane to quantify the feasible operational region of battery energy storage system (BESS) and to find the optimal power set-point solution. The s-Vector control features in the avoidance of using costly optimization solvers to solve optimization models online which is also an execution time bottleneck in real-time control. The advantages of s-Vector control are fast and stable computational efficiency. We validate a s-Vector based real-time controller of BESS to provide frequency response and voltage support as ancillary services for the power grid. The objective is to maximize the utility of the BESS asset. We formulate the dynamic capability curve of the DC-AC converter and the security requirements of the battery cells as constrains of the control system. The initial power set-points are obtained based on the traditional droop control approach. Based on s-Vector control, a fast optimization solution algorithm is proposed to find the optimal power set-point and guarantee the security. According to the experimental validation in our 720 kVA / 560 kWh BESS on EPFL campus, we achieve 100 ms of refreshing the real-time control loop. As a benchmark, using optimization solver requires 200 ms to update the real-time control loop.