Researcher profile

Xiaoyuan Fan

Xiaoyuan Fan contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 17 - UnverifiedVerification L1Unclaimed author
4works
0followers
2topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

4 published item(s)

preprint2022arXiv

Efficient Topology Assessment for Integrated Transmission and Distribution Network with 10,000+ Inverter-based Resources

The renewable energy proliferation calls upon the grid operators and planners to systematically evaluate the potential impacts of distributed energy resources (DERs). Considering the significant differences between various inverter-based resources (IBRs), especially the different capabilities between grid-forming inverters and grid-following inverters, it is crucial to develop an efficient and effective assessment procedure besides available co-simulation framework with high computation burdens. This paper presents a streamlined graph-based topology assessment for the integrated power system transmission and distribution networks. Graph analyses were performed based on the integrated graph of modified miniWECC grid model and IEEE 8500-node test feeder model, high performance computing platform with 40 nodes and total 2400 CPUs has been utilized to process this integrated graph, which has 100,000+ nodes and 10,000+ IBRs. The node ranking results not only verified the applicability of the proposed method, but also revealed the potential of distributed grid forming (GFM) and grid following (GFL) inverters interacting with the centralized power plants.

preprint2022arXiv

Proactive Posturing of Large Power Grid for Mitigating Hurricane Impacts

In the past decade, natural disasters such as hurricanes have challenged the operation and control of U.S. power grid. It is crucial to develop proactive strategies to assist grid operators for better emergency response and minimized electricity service interruptions; the better the grid may be preserved, the faster the grid can be restored. In this paper, we propose a proactive posturing of power system elements, and formulate a Security-Constrained Optimal Power Flow (SCOPF) informed by cross-domain hurricane modeling as well as its potential impacts on grid elements. Simulation results based on real-world power grid and historical hurricane event have verified the applicability of the proposed optimization formulation, which shows potential to enable grid operators and planners with interactive cross-domain data analytics for mitigating hurricane impacts.

preprint2022arXiv

Recovery Time Metric Demonstrated on Real-world Electric Grid for Hurricane Impacted Outages

This work proposes a methodology for estimating recovery times for transmission lines and substations, and is demonstrated on a real-world 1269-bus power system model of Puerto Rico under 20 hurricane scenarios, or stochastic realizations of asset failure under the meteorological conditions of Hurricane Maria. The method defines base recovery times for system components and identifies factors that impact these base values by means of multipliers. While the method is tested on transmission lines and substation failures due to hurricanes, it is based on a generic process that could be applied to any system component or event as a general recovery time estimation framework. The results show that given the two failure modes under study (transmission towers and substations), transmission towers appear to have a greater impact on recovery time estimates despite substations being given longer base outage times. Additionally, average recovery times for the simulated hurricanes across 20 scenarios is ~28,000 work crew days.

preprint2021arXiv

Component Importance and Interdependence Analysis for Transmission, Distribution and Communication Systems

For critical infrastructure restoration planning, the real-time scheduling and coordination of system restoration efforts, the key in decision-making is to prioritize those critical components that are out of service during the restoration. For this purpose, there is a need for component importance analysis. While it has been investigated extensively for individual systems, component importance considering interdependence among transmission, distribution and communication (T&D&C) systems has not been systematically analyzed and widely adopted. In this study, we propose a component importance assessment method in the context of interdependence between T&D&C networks. Analytic methods for multilayer networks and a set of metrics have been applied for assessing the component importance and interdependence between T&D&C networks based on their physical characteristics. The proposed methodology is further validated with integrated synthetic Illinois regional transmission, distribution, and communication (T&D&C) systems, the results reveal the unique characteristics of component/node importance, which may be strongly affected by the network topology and cross-domain node mapping.