Source author record

W. Wisniewski

W. Wisniewski appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
3topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2014arXiv

Preparation of hybrid Josephson junctions on Co-doped Ba-122 single crystals

In this paper we present a method for processing a hybrid Josephson junction on Co-doped BaFe2As2(Ba-122) single crystals with a thin film Pb-counter electrode and a barrier layer of TiOx. This includes the leveling and polishing of the crystals and structuring them with thin film techniques such as photo lithography, sputtering and ion beam etching (IBE). The junctions show hysteretical resistively and capacitively shunted junction (RCSJ)-like I-V characteristics with an IcRn-product of about 800uV.

preprint2013arXiv

SuperB Technical Design Report

In this Technical Design Report (TDR) we describe the SuperB detector that was to be installed on the SuperB e+e- high luminosity collider. The SuperB asymmetric collider, which was to be constructed on the Tor Vergata campus near the INFN Frascati National Laboratory, was designed to operate both at the Upsilon(4S) center-of-mass energy with a luminosity of 10^{36} cm^{-2}s^{-1} and at the tau/charm production threshold with a luminosity of 10^{35} cm^{-2}s^{-1}. This high luminosity, producing a data sample about a factor 100 larger than present B Factories, would allow investigation of new physics effects in rare decays, CP Violation and Lepton Flavour Violation. This document details the detector design presented in the Conceptual Design Report (CDR) in 2007. The R&D and engineering studies performed to arrive at the full detector design are described, and an updated cost estimate is presented. A combination of a more realistic cost estimates and the unavailability of funds due of the global economic climate led to a formal cancelation of the project on Nov 27, 2012.