Researcher profile

Victor Verdugo

Victor Verdugo contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
1topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2020arXiv

Breaking symmetries to rescue Sum of Squares in the case of makespan scheduling

The Sum of Squares (\sos{}) hierarchy gives an automatized technique to create a family of increasingly tight convex relaxations for binary programs. There are several problems for which a constant number of rounds of this hierarchy give integrality gaps matching the best known approximation algorithms. For many other problems, however, ad-hoc techniques give better approximation ratios than \sos{} in the worst case, as shown by corresponding lower bound instances. Notably, in many cases these instances are invariant under the action of a large permutation group. This yields the question how symmetries in a formulation degrade the performance of the relaxation obtained by the \sos{} hierarchy. In this paper, we study this for the case of the minimum makespan problem on identical machines. Our first result is to show that $Ω(n)$ rounds of \sos{} applied over the \emph{configuration linear program} yields an integrality gap of at least $1.0009$, where $n$ is the number of jobs. Our result is based on tools from representation theory of symmetric groups. Then, we consider the weaker \emph{assignment linear program} and add a well chosen set of symmetry breaking inequalities that removes a subset of the machine permutation symmetries. We show that applying $2^{\tilde{O}(1/\varepsilon^2)}$ rounds of the SA hierarchy to this stronger linear program reduces the integrality gap to $1+\varepsilon$, which yields a linear programming based polynomial time approximation scheme. Our results suggest that for this classical problem, symmetries were the main barrier preventing the \sos{}/ SA hierarchies to give relaxations of polynomial complexity with an integrality gap of~$1+\varepsilon$. We leave as an open question whether this phenomenon occurs for other symmetric problems.

preprint2020arXiv

Skyline Computation with Noisy Comparisons

Given a set of $n$ points in a $d$-dimensional space, we seek to compute the skyline, i.e., those points that are not strictly dominated by any other point, using few comparisons between elements. We adopt the noisy comparison model [FRPU94] where comparisons fail with constant probability and confidence can be increased through independent repetitions of a comparison. In this model motivated by Crowdsourcing applications, Groz & Milo [GM15] show three bounds on the query complexity for the skyline problem. We improve significantly on that state of the art and provide two output-sensitive algorithms computing the skyline with respective query complexity $O(nd\log (dk/δ))$ and $O(ndk\log (k/δ))$ where $k$ is the size of the skyline and $δ$ the expected probability that our algorithm fails to return the correct answer. These results are tight for low dimensions.

preprint2012arXiv

Split Scheduling with Uniform Setup Times

We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machine-, and sequence-independent. Problems of this kind were encountered when modelling practical problems in planning disaster relief operations. Our main algorithmic result is a polynomial-time algorithm for minimising total completion time on two parallel identical machines. We argue why the same problem with three machines is not an easy extension of the two-machine case, leaving the complexity of this case as a tantalising open problem. We give a constant-factor approximation algorithm for the general case with any number of machines and a polynomial-time approximation scheme for a fixed number of machines. For the version with objective minimising weighted total completion time we prove NP-hardness. Finally, we conclude with an overview of the state of the art for other split scheduling problems with job-, machine-, and sequence-independent setup times.