Researcher profile

T. Arkan

T. Arkan contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
1topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2022arXiv

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

preprint2022arXiv

Accelerated Lifetime Test of The SRF Dressed Cavity/Tuner System for LCLS II HE Project

The off-frequency detune method is being considered for application in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously [1]. Design of the tuner has been changed to deliver roughly 3 times larger frequency tuning range. Working requirements for off-frequency operation (OFO) state that cavities be tuned at least twice a month. This specification requires the in-crease of the tuner longevity by 20 times compared with LCLS-II demands. Accelerated longevity tests of the LCLS-II HE dressed cavity with tuner were conducted at FNAL's HTS. Detail analysis of wearing and impacts on performances of the tuner's piezo and stepper motor actuators will be presented. Additionally, results of longevity testing of the dressed cavity bellow, when cooled down to 2 K and compressed by 2.6 mm for roughly 2000 cycles, will be presented.

preprint2022arXiv

Tests Of The Extended Range SRF Cavity Tuners For The LCLS-II-HE Project*

The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation method was tested in the verification cryomodule (vCM) and CM 1 at Fermilab at 2 K. In both cases, the tuners achieved a frequency shift of -565$\pm$80 kHz. This study will discuss cavity frequency during each step as it is being assembled in the cryomodule string and finally when it is being tested at 2 K. Tracking the cavity frequency helped enable the tuners to reach this large frequency shift. The specific procedures of tuner setting during assembly will be presented.