Source author record

S. Lackey

S. Lackey appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2012arXiv

ACSYS in a box

The Accelerator Control System at Fermilab has evolved to enable this relatively large control system to be encapsulated into a "box" such as a laptop. The goal was to provide a platform isolated from the "online" control system. This platform can be used internally for making major upgrades and modifications without impacting operations. It also provides a standalone environment for research and development including a turnkey control system for collaborators. Over time, the code base running on Scientific Linux has enabled all the salient features of the Fermilab's control system to be captured in an off-the-shelf laptop. The anticipated additional benefits of packaging the system include improved maintenance, reliability, documentation, and future enhancements.

preprint2012arXiv

Status and plans for a SRF accelerator test faciliy at Fermilab

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facility will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.