Source author record

Rui Peng Liu

Rui Peng Liu appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
1topics
1close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2020arXiv

On Feasibility of Sample Average Approximation Solutions

When there are infinitely many scenarios, the current studies of two-stage stochastic programming problems rely on the relatively complete recourse assumption. However, such assumption can be unrealistic for many real-world problems. This motivates us to study general stochastic programming problems where the sample average approximation (SAA) solutions are not necessarily feasible. When the problems are convex and the true solutions lie in the interior of feasible solutions, we show the portion of infeasible SAA solutions decays exponentially as the sample size increases. We also study functions with chain-constrained domain, and show the portion of SAA solutions having a low degree of feasibility decays exponentially as the sample size increases. This result is then extended to multistage stochastic programming.

preprint2020arXiv

Risk Neutral Reformulation Approach to Risk Averse Stochastic Programming

The aim of this paper is to show that in some cases risk averse multistage stochastic programming problems can be reformulated in a form of risk neutral setting. This is achieved by a change of the reference probability measure making ``bad" (extreme) scenarios more frequent. As a numerical example we demonstrate advantages of such change-of-measure approach applied to the Brazilian Interconnected Power System operation planning problem.