Source author record

R. Andrews

R. Andrews appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

10works
4topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

10 published item(s)

preprint2020arXiv

The X-ray Emissivity of Low-Density Stellar Populations

The dynamical production of low-mass X-ray binaries and brighter cataclysmic variables (CVs) in dense globular clusters is well-established. We investigate how the X-ray emissivity of fainter X-ray binaries (principally CVs and coronally active binaries) varies between different environments. We compile calculations (largely from the literature) of the X-ray emissivity of old stellar populations, including open and globular clusters and several galaxies. We investigate three literature claims of unusual X-ray sources in low-density stellar populations. We show that a suggested quiescent neutron star in the open cluster NGC 6819 is a foreground M dwarf. We show that the suggested diffuse X-ray emission from an old nova shell in the globular cluster NGC 6366 is actually a background galaxy cluster. And we show that a suggested population of quiescent X-ray binaries in the Sculptor Dwarf Galaxy is mostly (perhaps entirely) background galaxies. We find that above densities of $10^4$ M$_{\odot}$/pc$^3$, the X-ray emissivity of globular clusters increases, due to dynamical production of X-ray emitting systems. Below this density, globular clusters have lower X-ray emissivity than the other populations, and we do not see a strong dependence of X-ray emissivity due to density effects. We find significant correlations between X-ray emissivity and binary fraction, metallicity, and density. Sampling these fits via bootstrap techniques gives less significant correlations, but confirms the effect of metallicity on low-density populations, and that of density on the full globular cluster sample.

preprint2016arXiv

Mechanical stability study for Integrable Optics Test Accelerator at Fermilab

The Integrable Optics Test Accelerator (IOTA) is proposed for operation at Fermilab. The goal of IOTA is to create practical nonlinear accelerator focusing systems with a large frequency spread and stable particle motion. The IOTA is a 40 m circumference, 150 MeV (e-), 2.5 MeV (p+) diagnostic test ring. A heavy low frequency steel floor girder is proposed as the primary tier for IOTA device component support. Two design lengths; (8) 3.96 m and (2) 3.1 m long girders with identical cross section completely encompass the ring. This study focuses on the 3.96 m length girder and the development of a working prototype. Hydrostatic Level Sensor (HLS), temperature, metrology and fast motion measurements characterize the anticipated mechanical stability of the IOTA ring.

preprint2015arXiv

Design of the LBNE Beamline

The Long Baseline Neutrino Experiment (LBNE) will utilize a beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a wide band beam of neutrinos toward a detector placed at the Sanford Underground Research Facility in South Dakota, about 1,300 km away. The main elements of the facility are a primary proton beamline and a neutrino beamline. The primary proton beam (60 -120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos are produced after the protons hit a solid target and produce mesons which are sign selected and subsequently focused by a set of magnetic horns into a 204 m long decay pipe where they decay mostly into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be ~1.2 MW, however the facility is designed to be upgradeable for 2.3 MW operation. We discuss here the status of the design and the associated challenges.

preprint2015arXiv

PSR J1930-1852: a pulsar in the widest known orbit around another neutron star

In the summer of 2012, during a Pulsar Search Collaboratory workshop, two high-school students discovered J1930$-$1852, a pulsar in a double neutron star (DNS) system. Most DNS systems are characterized by short orbital periods, rapid spin periods and eccentric orbits. However, J1930$-$1852 has the longest spin period ($P_{\rm spin}\sim$185 ms) and orbital period ($P_{\rm b}\sim$45 days) yet measured among known, recycled pulsars in DNS systems, implying a shorter than average and/or inefficient recycling period before its companion went supernova. We measure the relativistic advance of periastron for J1930$-$1852, $\dotω=0.00078$(4) deg/yr, which implies a total mass (M$_{\rm{tot}}=2.59$(4) M$_{\odot}$) consistent with other DNS systems. The $2σ$ constraints on M$_{\rm{tot}}$ place limits on the pulsar and companion masses ($m_{\rm p}<1.32$ M$_{\odot}$ and $m_{\rm c}>1.30$ M$_{\odot}$ respectively). J1930$-$1852's spin and orbital parameters challenge current DNS population models and make J1930$-$1852 an important system for further investigation.

preprint2015arXiv

Pxie low energy beam transport commissioning

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to ~25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source and LEBT, which includes 3 solenoids, several clearing electrodes/collimators and a chopping system, have been built, installed, and commissioned to full specification parameters. This report presents the outcome of our commissioning activities, including phase-space measurements at the end of the beam line under various neutralization schemes obtained by changing the electrodes' biases and chopper parameters.

preprint2015arXiv

Status of the warm front end of PXIE

A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.

preprint2015arXiv

The NuMI Neutrino Beam

This paper describes the hardware and operations of the Neutrinos at the Main Injector (NuMI) beam at Fermilab. It elaborates on the design considerations for the beam as a whole and for individual elements. The most important design details of individual components are described. Beam monitoring systems and procedures, including the tuning and alignment of the beam and NuMI long-term performance, are also discussed.

preprint2013arXiv

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750-MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5-GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

preprint2013arXiv

Status of the Design of the LBNE Neutrino Beamline

The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota, about 1300 km away. The neutrinos are produced as follows: First, protons extracted from the MI-10 section of the Main Injector (60-120 GeV) hit a solid target above grade and produce mesons. Then, the charged mesons are focused by a set of focusing horns into a 250 m long decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be ~700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW in order to enable the facility to run with an upgraded accelerator complex. We discuss here the status of the design and the associated challenges.

preprint2012arXiv

Status and plans for a SRF accelerator test faciliy at Fermilab

A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facility will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.