Researcher profile

Nysret Musliu

Nysret Musliu contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
5topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2022arXiv

Exact methods and lower bounds for the Oven Scheduling Problem

The Oven Scheduling Problem (OSP) is a new parallel batch scheduling problem that arises in the area of electronic component manufacturing. Jobs need to be scheduled to one of several ovens and may be processed simultaneously in one batch if they have compatible requirements. The scheduling of jobs must respect several constraints concerning eligibility and availability of ovens, release dates of jobs, setup times between batches as well as oven capacities. Running the ovens is highly energy-intensive and thus the main objective, besides finishing jobs on time, is to minimize the cumulative batch processing time across all ovens. This objective distinguishes the OSP from other batch processing problems which typically minimize objectives related to makespan, tardiness or lateness. We propose to solve this NP-hard scheduling problem via constraint programming (CP) and integer linear programming (ILP) and present corresponding models. For an experimental evaluation, we introduce a multi-parameter random instance generator to provide a diverse set of problem instances. Using state-of-the-art solvers, we evaluate the quality and compare the performance of our CP- and ILP-models. We show that our models can find feasible solutions for instances of realistic size, many of those being provably optimal or nearly optimal solutions. Finally, we derive theoretical lower bounds on the solution cost of feasible solutions to the OSP; these can be computed within a few seconds. We show that these lower bounds are competitive with those derived by state-of-the-art solvers.

preprint2020arXiv

Exact and Metaheuristic Approaches for the Production Leveling Problem

In this paper we introduce a new problem in the field of production planning which we call the Production Leveling Problem. The task is to assign orders to production periods such that the load in each period and on each production resource is balanced, capacity limits are not exceeded and the orders' priorities are taken into account. Production Leveling is an important intermediate step between long-term planning and the final scheduling of orders within a production period, as it is responsible for selecting good subsets of orders to be scheduled within each period. A formal model of the problem is proposed and NP-hardness is shown by reduction from Bin Backing. As an exact method for solving moderately sized instances we introduce a MIP formulation. For solving large problem instances, metaheuristic local search is investigated. A greedy heuristic and two neighborhood structures for local search are proposed, in order to apply them using Variable Neighborhood Descent and Simulated Annealing. Regarding exact techniques, the main question of research is, up to which size instances are solvable within a fixed amount of time. For the metaheuristic approaches the aim is to show that they produce near-optimal solutions for smaller instances, but also scale well to very large instances. A set of realistic problem instances from an industrial partner is contributed to the literature, as well as random instance generators. The experimental evaluation conveys that the proposed MIP model works well for instances with up to 250 orders. Out of the investigated metaheuristic approaches, Simulated Annealing achieves the best results. It is shown to produce solutions with less than 3% average optimality gap on small instances and to scale well up to thousands of orders and dozens of periods and products. The presented metaheuristic methods are already being used in the industry.

preprint2006arXiv

Efficient generation of rotating workforce schedules

Generating high-quality schedules for a rotating workforce is a critical task in all settings where a certain staffing level must be guaranteed beyond the capacity of single employees, such as for instance in industrial plants, hospitals, or airline companies. Results from ergonomics \cite{BEST91} indicate that rotating workforce schedules have a profound impact on the health and social life of employees as well as on their performance at work. Moreover, rotating workforce schedules must satisfy legal requirements and should also meet the objectives of the employing organization. We describe our solution to this problem. A basic design decision was to aim at quickly obtaining high-quality schedules for realistically sized problems while maintaining human control. The interaction between the decision maker and the algorithm therefore consists in four steps: (1) choosing a set of lengths of work blocks (a work block is a sequence of consecutive days of work shifts), (2) choosing a particular sequence of work and days-off blocks among those that have optimal weekend characteristics, (3) enumerating possible shift sequences for the chosen work blocks subject to shift change constraints and bounds on sequences of shifts, and (4) assignment of shift sequences to work blocks while fulfilling the staffing requirements. The combination of constraint satisfaction and problem-oriented intelligent backtracking algorithms in each of the four steps allows to find good solutions for real-world problems in acceptable time. Computational results from real-world problems and from benchmark examples found in the literature confirm the viability of our approach. The algorithms are now part of a commercial shift scheduling software package.