Source author record

Natashia Boland

Natashia Boland appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
3topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2015arXiv

Scheduling Network Maintenance Jobs with Release Dates and Deadlines to Maximize Total Flow Over Time: Bounds and Solution Strategies

We consider a problem that marries network flows and scheduling, motivated by the need to schedule maintenance activities in infrastructure networks, such as rail or general logistics networks. Network elements must undergo regular preventive maintenance, shutting down the arc for the duration of the activity. Careful coordination of these arc maintenance jobs can dramatically reduce the impact of such shutdown jobs on the flow carried by the network. Scheduling such jobs between given release dates and deadlines so as to maximize the total flow over time presents an intriguing case to study the role of time discretization. Here we prove that if the problem data is integer, and no flow can be stored at nodes, we can restrict attention to integer job start times. However if flow can be stored, fractional start times may be needed. This makes traditional strong integer programming scheduling models difficult to apply. Here we formulate an exact integer programming model for the continuous time problem, as well as integer programming models based on time discretization that can provide dual bounds, and that can - with minor modifications - also yield primal bounds. The resulting bounds are demonstrated to have small gaps on test instances, and offer a good trade-off for bound quality against computing time.

preprint2013arXiv

Scheduling unit processing time arc shutdown jobs to maximize network flow over time: complexity results

We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning period, which will require each to be shut down for exactly one time period. In general this problem is known to be NP-hard. Here we identify a number of characteristics that are relevant for the complexity of instance classes. In particular, we discuss instances with restrictions on the set of arcs that have maintenance to be scheduled; series parallel networks; capacities that are balanced, in the sense that the total capacity of arcs entering a (non-terminal) node equals the total capacity of arcs leaving the node; and identical capacities on all arcs.