Source author record

Muriel Saccoccio

Muriel Saccoccio appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

1works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2020arXiv

FIREBall-2: The Faint Intergalactic Medium Redshifted Emission Balloon Telescope

The Faint Intergalactic Medium Redshifted Emission Balloon (FIREBall) is a mission designed to observe faint emission from the circumgalactic medium of moderate redshift (z~0.7) galaxies for the first time. FIREBall observes a component of galaxies that plays a key role in how galaxies form and evolve, likely contains a significant amount of baryons, and has only recently been observed at higher redshifts in the visible. Here we report on the 2018 flight of the FIREBall-2 Balloon telescope, which occurred on September 22nd, 2018 from Fort Sumner, New Mexico. The flight was the culmination of a complete redesign of the spectrograph from the original FIREBall fiber-fed IFU to a wide-field multi-object spectrograph. The flight was terminated early due to a hole in the balloon, and our original science objectives were not achieved. The overall sensitivity of the instrument and telescope was 90,000 LU, due primarily to increased noise from stray light. We discuss the design of the FIREBall-2 spectrograph, modifications from the original FIREBall payload, and provide an overview of the performance of all systems. We were able to successfully flight test a new pointing control system, a UV-optimized, delta-doped and coated EMCCD, and an aspheric grating. The FIREBall-2 team is rebuilding the payload for another flight attempt in the Fall of 2021, delayed from 2020 due to COVID-19.