Source author record

Morteza Davari

Morteza Davari appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
4topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2021arXiv

Scheduling a single parallel-batching machine with non-identical job sizes and incompatible job families

We study the scheduling of jobs on a single parallel-batching machine with non-identical job sizes and incompatible job families. Jobs from the same family have the same processing time and can be loaded into a batch, as long as the batch size respects the machine capacity. The objective is to minimize the total weighted completion time. The problem combines two classic combinatorial problems, namely bin packing and single machine scheduling. We develop three new mixed-integer linear-programming formulations, namely an assignment-based formulation, a time-indexed formulation (TIF), and a set-partitioning formulation (SPF). We also propose a column generation (CG) algorithm for the SPF, which is the basis for a branch-and-price (B&P) algorithm and a CG-based heuristic. We develop a preprocessing method to reduce the formulation size. A heuristic framework based on proximity search is also developed using the TIF. The SPF and B&P can solve instances with non-unit and unit job durations to optimality with up to 80 and 150 jobs within reasonable runtime limits, respectively. The proposed heuristics perform better than the methods from the literature.

preprint2020arXiv

Single-machine scheduling with an external resource

This paper studies the complexity of single-machine scheduling with an external resource, which is rented for a non-interrupted period. Jobs that need this external resource are executed only when the external resource is available. There is a cost associated with the scheduling of jobs and a cost associated with the duration of the renting period of the external resource. We look at four classes of problems with an external resource: a class of problems where the renting period is budgeted and the scheduling cost needs to be minimized, a class of problems where the scheduling cost is budgeted and the renting period needs to be minimized, a class of two-objective problems where both, the renting period and the scheduling cost, are to be minimized, and a class of problems where a linear combination of the scheduling cost and the renting period is minimized. We provide a thorough complexity analysis (NP-hardness proofs and (pseudo-)polynomial algorithms) for different members of these four classes.