Source author record

Mojtaba Noghabaei

Mojtaba Noghabaei appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

3works
4topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2020arXiv

A Survey Study to Understand Industry Vision for Virtual and Augmented Reality Applications in Design and Construction

With advances in Building Information Modeling (BIM), Virtual Reality (VR) and Augmented Reality (AR) technologies have many potential applications in the Architecture, Engineering, and Construction (AEC) industry. However, the AEC industry, relative to other industries, has been slow in adopting AR/VR technologies, partly due to lack of feasibility studies examining the actual cost of implementation versus an increase in profit. The main objectives of this paper are to understand the industry trends in adopting AR/VR technologies and identifying gaps between AEC research and industry practices. The identified gaps can lead to opportunities for developing new tools and finding new use cases. To achieve these goals, two rounds of a survey at two different time periods (a year apart) were conducted. Responses from 158 industry experts and researchers were analyzed to assess the current state, growth, and saving opportunities for AR/VR technologies for the AEC industry. The authors used t-test for hypothesis testing. The findings show a significant increase in AR/VR utilization in the AEC industry over the past year from 2017 to 2018. The industry experts also anticipate strong growth in the use of AR/VR technologies over the next 5 to 10 years.

preprint2020arXiv

Hazard recognition in an immersive virtual environment: Framework for the simultaneous analysis of visual search and EEG patterns

Unmanaged hazards in dangerous construction environments proved to be one of the main sources of injuries and accidents. Hazard recognition is crucial to achieve effective safety management and reduce injuries and fatalities in hazardous job sites. Still, there has been lack of effort that can efficiently assist workers in improving their hazard recognition skills. This study presents virtual safety training in an Immersive Virtual Environment (IVE) to enhance worker's hazard recognition skills. A worker wearing a Virtual Reality (VR) device, that is equipped with an eye-tracker, virtually recognizes hazards on simulated construction sites while a brainwave-sensing device records brain activities. This platform can analyze the overall performance of the workers in a visual hazard recognition task and identify hazards that need additional intervention for each worker. This study provides novel insights on how a worker's brain and eye act simultaneously during a visual hazard recognition process. The presented method can take current safety training programs into another level by providing personalized feedback to the workers.

preprint2020arXiv

Toward Automated Virtual Assembly for Prefabricated Construction: Construction Sequencing through Simulated BIM

To adhere to the stringent time and budget requirements of construction projects, contractors are utilizing prefabricated construction methods to expedite the construction process. Prefabricated construction methods require an adequate schedule and understanding by the contractors and constructors to be successful. The specificity of prefabricated construction often leads to inefficient scheduling and costly rework time. The designer, contractor, and constructors must have a strong understanding of the assembly process to experience the full benefits of the method. At the root of understanding the assembly process is visualizing how the process is intended to be performed. Currently, a virtual construction model is used to explain and better visualize the construction process. However, creating a virtual construction model is currently time consuming and requires experienced personnel. The proposed simulation of the virtual assembly will increase the automation of virtual construction modeling by implementing the data available in a building information modeling (BIM) model. This paper presents various factors (i.e., formalization of construction sequence based on the level of development (LOD)) that needs to be addressed for the development of automated virtual assembly. Two case studies are presented to demonstrate these factors.