Researcher profile

Mohammed M. S. El-Kholany

Mohammed M. S. El-Kholany contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
2topics
2close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

Decomposition Strategies for Solving Scheduling Problems in Industrial Applications

This article presents an overview of a research study of a crucial optimization problem in the Computer Science/Operations research field: The Job-shop Scheduling Problem (JSP). The JSP is a challenging task in which a set of operations must be processed using a set of scarce machines to optimize a particular objective. The main purpose of the JSP is to determine the execution order of the processes assigned to each machine to optimize an objective. Our main interest in this study is to investigate developing decomposition strategies using logic programming to solve the JSP. We split our goal into two main phases. The first phase is to apply the decomposition approach and evaluate the proposed model by solving a set of known benchmark instances. The second phase is to apply the successful decomposition methods obtained from the first phase to solve a scheduling problem in the real-life application. In the current state, we finished the first phase and started the second one aiming to have a model that can provide a schedule of a factory for a short-time period.

preprint2021arXiv

Solving a Multi-resource Partial-ordering Flexible Variant of the Job-shop Scheduling Problem with Hybrid ASP

Many complex activities of production cycles, such as quality control or fault analysis, require highly experienced specialists to perform various operations on (semi)finished products using different tools. In practical scenarios, the selection of a next operation is complicated, since each expert has only a local view on the total set of operations to be performed. As a result, decisions made by the specialists are suboptimal and might cause significant costs. In this paper, we consider a Multi-resource Partial-ordering Flexible Job-shop Scheduling (MPF-JSS) problem where partially-ordered sequences of operations must be scheduled on multiple required resources, such as tools and specialists. The resources are flexible and can perform one or more operations depending on their properties. The problem is modeled using Answer Set Programming (ASP) in which the time assignments are efficiently done using Difference Logic. Moreover, we suggest two multi-shot solving strategies aiming at the identification of the time bounds allowing for a solution of the schedule optimization problem. Experiments conducted on a set of instances extracted from a medium-sized semiconductor fault analysis lab indicate that our approach can find schedules for 87 out of 91 considered real-world instances.