Researcher profile

Mayank Panwar

Mayank Panwar contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
2topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2022arXiv

Integrated Multiport Back-to-Back Power Converter for Type-4 Wind Turbine Generator with Hybrid Energy Storage System

This paper proposes a novel integrated multiport bidirectional back-to-back power converter for a type-4 wind turbine that accommodates a battery and supercapacitor for energy storage. The circuit topology reduces 4 switches compared to the traditional configuration. Moreover, owing to the dual-buck structure embedded in the phase leg, the circuitry has no short-circuit path, therefore it withstands short-circuited events for a much longer time than the normal phase-leg and prevents the reverse current in turn-off recovery. The use of a hybrid energy storage system with battery and supercapacitor helps smooth out the power output under wind gusts and stabilizes the DC-link voltage under grid fault conditions. The case studies are carried out with a 1.5 MW wind turbine system. Simulation results are provided for the theoretical validation.

preprint2022arXiv

Power Converter Topologies for Electrolyzer Applications to Enable Electric Grid Services

Hydrogen electrolyzers, with their operational flexibility, can be configured as smart dynamic loads which can provide grid services and facilitate the integration of more renewable energy sources into the electrical grid. However, to enable this ability, the electrolyzer system should be able to control both active and reactive power in coordination with the low-level controller of the electrolyzer via the power electronics system interface between the utility grid and electrolyzer. This paper discusses power converter topologies and the control scheme of this power electronics interface for electrolyzer applications to enable electricity grid services. For the sake of unity, in this paper, we consider the power converter system interfacing the utility grid at the line-to-line root mean square RMS value of 480 VAC 60 Hz and supplying to the 3500 A 750 kW PEM electrolyzer stack.

preprint2020arXiv

An Improved Transmission Switching Algorithm for Managing Post-(N-1) Contingency Violations in Electricity Networks

This letter is a proof of concept for an improved transmission switching (TS) performance by moving the search space to load shed buses. Research from the past shows that changing transmission system topology changes the power flows and removes post contingency violations. Hence, TS can reduce the amount of load shed after an N-1 contingency. One of the major challenges is to find the best TS candidate in a suitable time. In this letter, the best TS candidate is determined by using a novel heuristic bi-level method based on linear sensitivity. The proposed bi-level method is easy to implement in the real world, guarantees removal of post contingency violations, and ranks the best TS candidates based on minimum load shedding possible. Moreover, the proposed method is computationally efficient since it does not involve mixed integer programming. The bi-level method is implemented by modifying the topology of transmission system after the N-1 contingency in the IEEE 39-bus test system and results show that TS with generation re-dispatch is the best solution for load shed recovery to prevent cascading failures. Moreover, the bi-level method performs even for the case when the existing methods in literature fail to completely remove post contingency violations.