Researcher profile

M. W. G. Johnson

M. W. G. Johnson contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

Collaborative Experience between Scientific Software Projects using Agile Scrum Development

Developing sustainable software for the scientific community requires expertise in software engineering and domain science. This can be challenging due to the unique needs of scientific software, the insufficient resources for software engineering practices in the scientific community, and the complexity of developing for evolving scientific contexts. While open-source software can partially address these concerns, it can introduce complicating dependencies and delay development. These issues can be reduced if scientists and software developers collaborate. We present a case study wherein scientists from the SuperNova Early Warning System collaborated with software developers from the Scalable Cyberinfrastructure for Multi-Messenger Astrophysics project. The collaboration addressed the difficulties of open-source software development, but presented additional risks to each team. For the scientists, there was a concern of relying on external systems and lacking control in the development process. For the developers, there was a risk in supporting a user-group while maintaining core development. These issues were mitigated by creating a second Agile Scrum framework in parallel with the developers' ongoing Agile Scrum process. This Agile collaboration promoted communication, ensured that the scientists had an active role in development, and allowed the developers to evaluate and implement the scientists' software requirements. The collaboration provided benefits for each group: the scientists actuated their development by using an existing platform, and the developers utilized the scientists' use-case to improve their systems. This case study suggests that scientists and software developers can avoid scientific computing issues by collaborating and that Agile Scrum methods can address emergent concerns.

preprint2020arXiv

Trans-Neptunian objects found in the first four years of the Dark Energy Survey

We present a catalog of 316 trans-Neptunian bodies detected by the Dark Energy Survey (DES). These objects include 245 discoveries by DES (139 not previously published) detected in $\approx 60,000$ exposures from the first four seasons of the survey (&#34;Y4&#34; data). The survey covers a contiguous 5000 deg$^2$ of the southern sky in the $grizY$ optical/NIR filter set, with a typical TNO in this part of the sky being targeted by $25-30$ Y4 exposures. We describe the processes for detection of transient sources and the linkage into TNO orbits, which are made challenging by the absence of the few-hour repeat observations employed by TNO-optimized surveys. We also describe the procedures for determining detection efficiencies vs. magnitude and estimating rates of false-positive linkages. This work presents all TNOs which were detected on $\ge 6$ unique nights in the Y4 data and pass a &#34;sub-threshold confirmation&#34; test wherein we demand the the object be detectable in a stack of the individual images in which the orbit indicates an object should be present, but was not detected. This eliminates false positives and yields TNO detections complete to $r\lesssim 23.3$ mag with virtually no dependence on orbital properties for bound TNOs at distance $30\,{\rm AU}<d<2500\,{\rm AU}.$ The final DES TNO catalog is expected to yield $>0.3$ mag more depth, and arcs of $>4$ years for nearly all detections.