Researcher profile

K. Furukawa

K. Furukawa contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2010arXiv

Belle II Technical Design Report

The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.

preprint2002arXiv

Beam Feedback Systems and BPM Read-out System for the Two-Bunch Acceleration at Kekb Linac

In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and orbit of each bunch is indispensable. Thus the beam energy and orbit feedback systems have been upgraded. Since beam characteristics are acquired through beam position monitors (BPM), their read-out system was improved to meet two-bunch requirements. Combined waveforms from BPM's were adjusted with delay cables avoiding overlaps and they enabled simultaneous measurement of beam positions of two bunches. The beam energies of two bunches were balanced by tuning rf pulse timings, and the average energy was stabilized by adjusting the accelerating rf phases. The average beam orbits were also stabilized. Slow feedback systems at the injector section for charge and bunching stabilities are being planned as well. These systems were used successfully in the test beams and will be employed in the routine operation.