Source author record

Jiří Fink

Jiří Fink appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

3works
2topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2020arXiv

A Greedy algorithm for local heating

This paper studies a planning problem for supplying hot water in domestic environment. Hereby, boilers (e.g. gas or electric boilers, heat pumps or microCHPs) are used to heat water and store it for domestic demands. We consider a simple boiler which is either turned on or turned off and is connected to a buffer of limited capacity. The energy needed to run the boiler has to be bought e.g. on a day-ahead market, so we are interested in a planning which minimizes the cost to supply the boiler with energy in order to fulfill the given heat demand. We present a greedy algorithm for this heating problem whose time complexity is O(T α(T )) where T is the number of time intervals and α is the inverse of Ackermann function.

preprint2020arXiv

A New Arc-Routing Algorithm Applied to Winter Road Maintenance

This paper studies large scale instances of a fairly general arc-routing problem as well as incorporate practical constraints in particular coming from the scheduling problem of the winter road maintenance (e.g. different priorities for and methods of road maintenance). We develop a new algorithm based on a bin-packing heuristic which is well-scalable and able to solve road networks on thousands of crossroads and road segments in few minutes. Since it is impossible to find an optimal solution for such a large instances to compare it with a result of our algorithm, we also develop techniques to compute lower bounds which are based on Integer Linear Programming and Lazy Constraints.

preprint2020arXiv

Approximation algorithms for scheduling a group of heat pumps

This paper studies planning problems for a group of heating systems which supply the hot water demand for domestic use in houses. These systems (e.g. gas or electric boilers, heat pumps or microCHPs) use an external energy source to heat up water and store this hot water for supplying the domestic demands. The latter allows to some extent a decoupling of the heat production from the heat demand. We focus on the situation where each heating system has its own demand and buffer and the supply of the heating systems is coming from a common source. In practice, the common source may lead to a coupling of the planning for the group of heating systems. The bottleneck to supply the energy may be the capacity of the distribution system (e.g. the electricity networks or the gas network). As this has to be dimensioned for the maximal consumption, it is important to minimize the maximal peak. This planning problem is known to be \NP-hard. We present polynomial-time approximation algorithms for four variants of peak minimization problems, and we determine the worst-case approximation error.