Source author record

Jan Mandík

Jan Mandík appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

1works
2topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2026arXiv

Resource-constrained Project Scheduling with Time-of-Use Energy Tariffs and Machine States: A Logic-based Benders Decomposition Approach

In this paper, we investigate the Resource-Constrained Project Scheduling Problem (RCPSP) with time-of-use energy tariffs (TOU) and machine states, a variant of RCPSP for production scheduling where energy price is part of the criteria and one machine is highly energy-demanding and can be in one of the following three states: proc, idle, or off. The problem involves scheduling all tasks, respecting precedence constraints and resource limitations, while minimizing the combination of the overall makespan and the total energy cost (TEC), which varies according to the TOU pricing, which can take negative values. We propose two novel approaches to solve it: a monolithic Constraint Programming (CP) approach and a Logic-Based Benders Decomposition (LBBD) approach. The latter combines a master problem dealing with energy cost solved using Integer Linear Programming (ILP) with a subproblem handling the RCPSP resolved using CP. Both approaches surpass the monolithic compact ILP approach, but the LBBD significantly outperforms the CP when the ratio of energy-intensive tasks over the overall tasks is moderate, allowing for solving instances with up to 1600 tasks in sparse instances. Finally, we put forth a way of generalizing our LBBD approach to other problems sharing similar characteristics, and we applied it to a problem based on an RCPSP problem with blocking times & total weighted tardiness criterion and a flexible job shop.