Source author record

I. Kourbanis

I. Kourbanis appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

29works
5topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

29 published item(s)

preprint2022arXiv

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

preprint2016arXiv

First measurement of electron neutrino appearance in NOvA

We report results from the first search for $ν_μ\toν_e$ transitions by the NOvA experiment. In an exposure equivalent to $2.74\times10^{20}$ protons-on-target in the upgraded NuMI beam at Fermilab, we observe 6 events in the Far Detector, compared to a background expectation of $0.99\pm0.11$ (syst.) events based on the Near Detector measurement. A secondary analysis observes 11 events with a background of $1.07\pm0.14$ (syst.). The $3.3σ$ excess of events observed in the primary analysis disfavors $0.1π< δ_{CP} < 0.5π$ in the inverted mass hierarchy at the 90% C.L.

preprint2016arXiv

First measurement of muon-neutrino disappearance in NOvA

This paper reports the first measurement using the NOvA detectors of $ν_μ$ disappearance in a $ν_μ$ beam. The analysis uses a 14 kton-equivalent exposure of $2.74 \times 10^{20}$ protons-on-target from the Fermilab NuMI beam. Assuming the normal neutrino mass hierarchy, we measure $Δm^{2}_{32}=(2.52^{+0.20}_{-0.18})\times 10^{-3}$ eV$^{2}$ and $\sin^2θ_{23}$ in the range 0.38-0.65, both at the 68% confidence level, with two statistically-degenerate best fit points at $\sin^2θ_{23} = $ 0.43 and 0.60. Results for the inverted mass hierarchy are also presented.

preprint2014arXiv

Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research

Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF acceleration technologies, and with design concepts for a staged implementation. This paper will review the status of the Project X conceptual development and the associated R&D programs.

preprint2013arXiv

6 Batch Injection and Slipped Beam Tune Measurements in Fermilab's Main Injector

During Nova operations it is planned to run the Fermilab Recycler in a 12 batch slip stacking mode. In preparation for this, measurements of the tune during a six batch injection and then as the beam is slipped by changing the RF frequency, but without a 7th injection, have been carried out in the Main Injector. The coherent tune shifts due to the changing beam intensity were measured and compared well with the theoretically expected tune shift. The tune shifts due to changing RF frequency, required for slip stacking, also compare well with the linear theory, although some nonlinear affects are apparent at large frequency changes. These results give us confidence that the expected tunes shifts during 12 batch slip stacking Recycler operations can be accommodated.

preprint2013arXiv

Coalescing at 8 GeV in the Fermilab Main Injector

For Project X, it is planned to inject a beam of 3 10**11 particles per bunch into the Main Injector. To prepare for this by studying the effects of higher intensity bunches in the Main Injector it is necessary to perform coalescing at 8 GeV. The results of a series of experiments and simulations of 8 GeV coalescing are presented. To increase the coalescing efficiency adiabatic reduction of the 53 MHz RF is required, resulting in ~70% coalescing efficiency of 5 initial bunches. Data using wall current monitors has been taken to compare previous work and new simulations for 53 MHz RF reduction, bunch rotations and coalescing, good agreement between experiment and simulation was found. Possible schemes to increase the coalescing efficiency and generate even higher intensity bunches are discussed. These require improving the timing resolution of the low level RF and/or tuning the adiabatic voltage reduction of the 53 MHz.

preprint2013arXiv

Project X: Accelerator Reference Design

Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator physics design, and the technological basis for such a facility. Part 2 is available as arXiv:1306.5009 [hep-ex] and Part 3 is available as arXiv:1306.5024 [physics.acc-ph].

preprint2013arXiv

Single/Few Bunch Space Charge Effects at 8-GeV in the Fermilab Main Injector

For Project X, it is planned to inject a beam of 3x10**11 particles per bunch into the Main Injector. Therefore, at 8-GeV, there will be increased space charge tune shifts and an increased incoherent tune spread. In preparation for these higher intensity bunches exploratory studies have commenced looking at the transmission of different intensity bunches at different tunes. An experiment is described with results for bunch intensities between 20 and 300 10**9 particles. To achieve the highest intensity bunches coalescing at 8-GeV is required, resulting in a longer bunch length. Comparisons show that similar transmission curves are obtained when the intensity and bunch length have increased by factors of 3.2 and 3.4 respectively, indicating the incoherent tune shifts are similar, as expected from theory. The results of these experiments will be used in conjugation with simulations to further study high intensity bunches in the Main Injector.

preprint2012arXiv

A gap clearing kicker for Main Injector

Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.

preprint2012arXiv

A new Main Injector radio frequency system for 2.3 MW Project X operations

For Project X Fermilab Main Injector will be required to provide up to 2.3 MW to a neutrino production target at energies between 60 and 120 GeV. To accomplish the above power levels 3 times the current beam intensity will need to be accelerated. In addition the injection energy of Main Injector will need to be as low as 6 GeV. The current 30 year old Main Injector radio frequency system will not be able to provide the required power and a new system will be required. The specifications of the new system will be described.

preprint2012arXiv

Mu2e Conceptual Design Report

Mu2e at Fermilab will search for charged lepton flavor violation via the coherent conversion process mu- N --> e- N with a sensitivity approximately four orders of magnitude better than the current world's best limits for this process. The experiment's sensitivity offers discovery potential over a wide array of new physics models and probes mass scales well beyond the reach of the LHC. We describe herein the conceptual design of the proposed Mu2e experiment. This document was created in partial fulfillment of the requirements necessary to obtain DOE CD-1 approval, which was granted July 11, 2012.

preprint2012arXiv

Project X functional requirements specification

Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

preprint2012arXiv

Test of Lorentz and CPT violation with Short Baseline Neutrino Oscillation Excesses

The sidereal time dependence of MiniBooNE electron neutrino and anti-electron neutrino appearance data are analyzed to search for evidence of Lorentz and CPT violation. An unbinned Kolmogorov-Smirnov test shows both the electron neutrino and anti-electron neutrino appearance data are compatible with the null sidereal variation hypothesis to more than 5%. Using an unbinned likelihood fit with a Lorentz-violating oscillation model derived from the Standard Model Extension (SME) to describe any excess events over background, we find that the electron neutrino appearance data prefer a sidereal time-independent solution, and the anti-electron neutrino appearance data slightly prefer a sidereal time-dependent solution. Limits of order 10E-20 GeV are placed on combinations of SME coefficients. These limits give the best limits on certain SME coefficients for muon neutrino to electron neutrino and anti-muon neutrino to anti-electron neutrino oscillations. The fit values and limits of combinations of SME coefficients are provided.

preprint2011arXiv

Dual baseline search for muon neutrino disappearance at 0.5 eV^2 < Δm^2 < 40 eV^2

The SciBooNE and MiniBooNE collaborations report the results of a ν_μdisappearance search in the Δm^2 region of 0.5-40 eV^2. The neutrino rate as measured by the SciBooNE tracking detectors is used to constrain the rate at the MiniBooNE Cherenkov detector in the first joint analysis of data from both collaborations. Two separate analyses of the combined data samples set 90% confidence level (CL) limits on ν_μdisappearance in the 0.5-40 eV^2 Δm^2 region, with an improvement over previous experimental constraints between 10 and 30 eV^2.

preprint2011arXiv

Measurement of $ν_μ$-induced charged-current neutral pion production cross sections on mineral oil at $E_ν\in0.5-2.0$ GeV

Using a custom 3 Čerenkov-ring fitter, we report cross sections for $ν_μ$-induced charged-current single $π^0$ production on mineral oil (\chtwo) from a sample of 5810 candidate events with 57% signal purity over an energy range of $0.5-2.0$GeV. This includes measurements of the absolute total cross section as a function of neutrino energy, and flux-averaged differential cross sections measured in terms of $Q^2$, $μ^-$ kinematics, and $π^0$ kinematics. The sample yields a flux-averaged total cross section of $(9.2\pm0.3_{stat.}\pm1.5_{syst.})\times10^{-39}$cm$^2$/CH$_2$ at mean neutrino energy of 0.965GeV.

preprint2011arXiv

Measurement of Neutrino-Induced Charged-Current Charged Pion Production Cross Sections on Mineral Oil at E$_ν\sim 1~\textrm{GeV}$

Using a high-statistics, high-purity sample of $ν_μ$-induced charged current, charged pion events in mineral oil (CH$_2$), MiniBooNE reports a collection of interaction cross sections for this process. This includes measurements of the CC$π^+$ cross section as a function of neutrino energy, as well as flux-averaged single- and double-differential cross sections of the energy and direction of both the final-state muon and pion. In addition, each of the single-differential cross sections are extracted as a function of neutrino energy to decouple the shape of the MiniBooNE energy spectrum from the results. In many cases, these cross sections are the first time such quantities have been measured on a nuclear target and in the 1 GeV energy range.

preprint2011arXiv

Updated Report Acceleration of Polarized Protons to 120-150 GeV/c at Fermilab

The SPIN@FERMI collaboration has updated its 1991-95 Reports on the acceleration of polarized protons in Fermilab's Main Injector, which was commissioned by Fermilab. This Updated Report summarizes some updated Physics Goals for a 120-150 GeV/c polarized proton beam. It also contains an updated discussion of the Modifications and Hardware needed for a polarized beam in the Main Injector, along with an updated Schedule and Budget.

preprint2010arXiv

First Measurement of the Muon Neutrino Charged Current Quasielastic Double Differential Cross Section

A high-statistics sample of charged-current muon neutrino scattering events collected with the MiniBooNE experiment is analyzed to extract the first measurement of the double differential cross section ($\frac{d^2σ}{dT_μd\cosθ_μ}$) for charged-current quasielastic (CCQE) scattering on carbon. This result features minimal model dependence and provides the most complete information on this process to date. With the assumption of CCQE scattering, the absolute cross section as a function of neutrino energy ($σ[E_ν]$) and the single differential cross section ($\frac{dσ}{dQ^2}$) are extracted to facilitate comparison with previous measurements. These quantities may be used to characterize an effective axial-vector form factor of the nucleon and to improve the modeling of low-energy neutrino interactions on nuclear targets. The results are relevant for experiments searching for neutrino oscillations.

preprint2010arXiv

Measurement of ν_μand \barν_μinduced neutral current single $π^0$ production cross sections on mineral oil at E_νO(1 GeV)

MiniBooNE reports the first absolute cross sections for neutral current single π^0 production on CH_2 induced by neutrino and antineutrino interactions measured from the largest sets of NC π^0 events collected to date. The principal result consists of differential cross sections measured as functions of π^0 momentum and π^0 angle averaged over the neutrino flux at MiniBooNE. We find total cross sections of (4.76+/-0.05_{stat}+/-0.76_{sys})*10^{-40} cm^2/nucleon at a mean energy of <E_ν>=808 MeV and (1.48+/-0.05_{stat}+/-0.23_{sys})*10^{-40} cm^2/nucleon at a mean energy of <E_ν>=664 MeV for ν_μand \barν_μinduced production, respectively. In addition, we have included measurements of the neutrino and antineutrino total cross sections for incoherent exclusive NC 1π^0 production corrected for the effects of final state interactions to compare to prior results.

preprint2009arXiv

First Measurement of $ν_μ$ and $ν_e$ Events in an Off-Axis Horn-Focused Neutrino Beam

We report the first observation of off-axis neutrino interactions in the MiniBooNE detector from the NuMI beamline at Fermilab. The MiniBooNE detector is located 745 m from the NuMI production target, at 110 mrad angle ($6.3^{\circ}$) with respect to the NuMI beam axis. Samples of charged current quasi-elastic $ν_μ$ and $ν_e$ interactions are analyzed and found to be in agreement with expectation. This provides a direct verification of the expected pion and kaon contributions to the neutrino flux and validates the modeling of the NuMI off-axis beam.

preprint2009arXiv

Measurement of the ν_μcharged current π^+ to quasi-elastic cross section ratio on mineral oil in a 0.8 GeV neutrino beam

Using high statistics samples of charged current $ν_μ$ interactions, MiniBooNE reports a measurement of the single charged pion production to quasi-elastic cross section ratio on mineral oil (CH$_2$), both with and without corrections for hadron re-interactions in the target nucleus. The result is provided as a function of neutrino energy in the range 0.4 GeV $< E_ν<$ 2.4 GeV with 11% precision in the region of highest statistics. The results are consistent with previous measurements and the prediction from historical neutrino calculations.

preprint2008arXiv

Operational aspects of the Main Injector large aperture quadrupole (WQB)

A two-year Large Aperture Quadrupole (WQB) Project was completed in the summer of 2006 at Fermilab. Nine WQBs were designed, fabricated and bench-tested by the Technical Division. Seven of them were installed in the Main Injector and the other two for spares. They perform well. The aperture increase meets the design goal and the perturbation to the lattice is minimal. The machine acceptance in the injection and extraction regions is increased from 40pi to 60pi mm-mrad. This paper gives a brief report of the operation and performance of these magnets.