Researcher profile

Hossein Sekhavatmanesh

Hossein Sekhavatmanesh contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
4topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2020arXiv

A convex model for induction motor starting transients imbedded in an OPF-based optimization problem

Large horsepower induction motors play a critical role in the operation of industrial facilities. In this respect, the distribution network operators dedicate a high priority to the operational safety of these motor loads. In this paper, the induction motor starting is modeled analytically and in a semi-static fashion. This model is imbedded in a convex distribution system restoration problem. In this optimization problem, it is aimed to determine the optimal status of static loads and the optimal dispatch of distributed generators such that: a) the induction motors can be reaccelerated in a safe way and, b) the total power of static loads that cannot be supplied before the motor energization, is minimized. The proposed optimization problem is applied in the case of a distribution network under different simulation scenarios. The feasibility and accuracy of the obtained results are validated using a) off-line time-domain simulations, and b) Power Hardware-In-the-Loop experiments.

preprint2020arXiv

A Multi-Step Reconfiguration Model for Active Distribution Network Restoration Integrating DG Start-Up Sequences

The ever-increasing penetration of Distributed Generators (DGs) in distribution networks suggests to enable their potentials in better fulfilling the restoration objective. The objective of the restoration problem is to resupply the maximum energy of loads considering their priorities using minimum switching operations. Basically, it is desired to provide a unique configuration that is valid regarding the load and generation profiles along the entire restorative period. However, this unique configuration may not satisfy at the same time: I) the DG start-up requirements at the beginning of the restoration plan and II) the topological conditions that would allow the DG to provide later on the most efficient support for the supply of loads. Therefore, it is proposed in this paper to allow a limited number of reconfiguration steps according to the DG start-up requirements. In addition, this paper presents a novel formulation for the reconfiguration problem that accounts for partial restoration scenarios where the whole unsupplied area cannot be restored. The decision variables of the proposed multi-step restoration problem are: I) the line switching actions at each step of the reconfiguration process, II) the load switching actions during the whole restorative period and, III) the active/reactive power dispatch of DGs during the whole restorative period. A relaxed AC power flow formulation is integrated to the optimization problem in order to ensure the feasibility of the solution concerning the operational safety constraints. The overall model is formulated in terms of a mixed-integer second-order cone programming. Two simulation scenarios are studied in order to illustrate different features of the proposed strategy and to demonstrate its effectiveness particularly in the case of large-scale outages in distribution networks.

preprint2020arXiv

A Novel Decomposition Solution Approach for the Restoration Problem in Distribution Networks

The distribution network restoration problem is by nature a mixed integer and non-linear optimization problem due to the switching decisions and Optimal Power Flow (OPF) constraints, respectively. The link between these two parts involves logical implications modelled through big-M coefficients. The presence of these coefficients makes the relaxation of the mixed-integer problem using branch-and-bound method very poor in terms of computation burden. Moreover, this link inhibits the use of classical Benders algorithm in decomposing the problem because the resulting cuts will still depend on the big-M coefficients. In this paper, a novel decomposition approach is proposed for the restoration problem named Modified Combinatorial Benders (MCB). In this regard, the reconfiguration problem and the OPF problem are decomposed into master and sub problems, which are solved through successive iterations. In the case of a large outage area, the numerical results show that the MCB provides, within a short time (after a few iterations), a restoration solution with a quality that is close to the proven optimality when it can be exhibited.