Source author record

G. Janser

G. Janser appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2016arXiv

Commissioning experience and beam physics measurements at the SwissFEL Injector Test Facility

The SwissFEL Injector Test Facility operated at the Paul Scherrer Institute between 2010 and 2014, serving as a pilot plant and testbed for the development and realization of SwissFEL, the X-ray Free-Electron Laser facility under construction at the same institute. The test facility consisted of a laser-driven rf electron gun followed by an S-band booster linac, a magnetic bunch compression chicane and a diagnostic section including a transverse deflecting rf cavity. It delivered electron bunches of up to 200 pC charge and up to 250 MeV beam energy at a repetition rate of 10 Hz. The measurements performed at the test facility not only demonstrated the beam parameters required to drive the first stage of an FEL facility, but also led to significant advances in instrumentation technologies, beam characterization methods and the generation, transport and compression of ultra-low-emittance beams. We give a comprehensive overview of the commissioning experience of the principal subsystems and the beam physics measurements performed during the operation of the test facility, including the results of the test of an in-vacuum undulator prototype generating radiation in the vacuum ultraviolet and optical range.

preprint2001arXiv

Replacement of Magnet Power Supplies, Control and Field-Bus for the Psi Cyclotron Accelerators

Magnet power supplies in the PSI accelerator complex with their control and field-bus are old. Some components are more then 30 years old. To guarantee further maintenance and to meet the more demanding specifications for operation with the 2mA beam, they have to be replaced. The switched power supplies, developed for SLS, will be used. This implies a major redesign of part of the accelerator control system, which is now based on CAMAC, ROAD-C and other in house developed hardware including the machine protection system. The modified control for the new set-up will be based on VME and alternatively CAMAC, with dedicated processors for the functionality of the machine protection system.