Researcher profile

Frans Schalekamp

Frans Schalekamp contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2012arXiv

On the Complexity of the Minimum Latency Scheduling Problem on the Euclidean Plane

We show NP-hardness of the minimum latency scheduling (MLS) problem under the physical model of wireless networking. In this model a transmission is received successfully if the Signal to Interference-plus-Noise Ratio (SINR), is above a given threshold. In the minimum latency scheduling problem, the goal is to assign a time slot and power level to each transmission, so that all the messages are received successfully, and the number of distinct times slots is minimized. Despite its seeming simplicity and several previous hardness results for various settings of the minimum latency scheduling problem, it has remained an open question whether or not the minimum latency scheduling problem is NP-hard, when the nodes are placed in the Euclidean plane and arbitrary power levels can be chosen for the transmissions. We resolve this open question for all path loss exponent values $α\geq 3$.

preprint2012arXiv

Split Scheduling with Uniform Setup Times

We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machine-, and sequence-independent. Problems of this kind were encountered when modelling practical problems in planning disaster relief operations. Our main algorithmic result is a polynomial-time algorithm for minimising total completion time on two parallel identical machines. We argue why the same problem with three machines is not an easy extension of the two-machine case, leaving the complexity of this case as a tantalising open problem. We give a constant-factor approximation algorithm for the general case with any number of machines and a polynomial-time approximation scheme for a fixed number of machines. For the version with objective minimising weighted total completion time we prove NP-hardness. Finally, we conclude with an overview of the state of the art for other split scheduling problems with job-, machine-, and sequence-independent setup times.

preprint2011arXiv

A Proof of the Boyd-Carr Conjecture

Determining the precise integrality gap for the subtour LP relaxation of the traveling salesman problem is a significant open question, with little progress made in thirty years in the general case of symmetric costs that obey triangle inequality. Boyd and Carr [3] observe that we do not even know the worst-case upper bound on the ratio of the optimal 2-matching to the subtour LP; they conjecture the ratio is at most 10/9. In this paper, we prove the Boyd-Carr conjecture. In the case that a fractional 2-matching has no cut edge, we can further prove that an optimal 2-matching is at most 10/9 times the cost of the fractional 2-matching.