Source author record

Devarpita Sinha

Devarpita Sinha appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

1works
3topics
1close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2020arXiv

Optimal Scheduling for Maximizing Information Freshness & System Performance in Industrial Cyber-Physical Systems

Age of Information is a newly introduced metric, getting vivid attention for measuring the freshness of information in real-time networks. This parameter has evolved to guarantee the reception of timely information from the latest status update, received by a user from any real-time application. In this paper, we study a centralized, closed-loop, networked controlled industrial wireless sensor-actuator network for cyber-physical production systems. Here, we jointly address the problem of transmission scheduling of sensor updates and the restoration of an information flow-line after any real-time update having hard-deadline drops from it, resulting a break in the loop. Unlike existing real-time scheduling policies that only ensure timely updates, this work aims to accomplish both the time-sensitivity and data freshness in new and regenerative real-time updates in terms of the age of information. Here, the coexistence of both cyber and physical units and their individual requirements for providing the quality of service to the system, as a whole, seems to be one of the major challenges to handle. In this work, minimization of staleness of the time-critical updates to extract maximum utilization out of its information content and its effects on other network performances are thoroughly investigated. A greedy scheduling policy called Deadline-aware highest latency first has been used to solve this problem; its performance optimality is proved analytically. Finally, our claim is validated by comparing the results obtained by our algorithm with those of other popular scheduling policies through extensive simulations.