Source author record

Davy Monticolo

Davy Monticolo appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
3topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2020arXiv

Results of multi-agent system and ontology to manage ideas and represent knowledge in a challenge of creativity

This article is about an intelligent system to support ideas management as a result of a multi-agent system used in a distributed system with heterogeneous information as ideas and knowledge, after the results about an ontology to describe the meaning of these ideas. The intelligent system assists participants of the creativity workshop to manage their ideas and consequently proposing an ontology dedicated to ideas. During the creative workshop many creative activities and collaborative creative methods are used by roles immersed in this creativity workshop event where they share knowledge. The collaboration of these roles is physically distant, their interactions might be synchrony or asynchrony, and the information of the ideas are heterogeneous, so we can say that the process is distributed. Those ideas are writing in natural language by participants which have a role and the ideas are heterogeneous since some of them are described by schema, text or scenario of use. This paper presents first, our MAS and second our Ontology design.

preprint2020arXiv

Use of Bayesian Network characteristics to link project management maturity and risk of project overcost

The project management field has the imperative to increase the project probability of success. Experts have developed several project management maturity models to assets and improve the project outcome. However, the current literature lacks of models allowing correlating the measured maturity and the expected probability of success. This paper uses the characteristics of Bayesian networks to formalize experts' knowledge and to extract knowledge from a project overcost database. It develops a method to estimate the impact of project management maturity on the risk of project overcost. A general framework is presented. An industrial case is used to illustrate the application of the method.