Source author record

Davi Mecler

Davi Mecler appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

1works
1topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2021arXiv

Iterated Greedy Algorithms for a Complex Parallel Machine Scheduling Problem

This paper addresses a complex parallel machine scheduling problem with jobs divided into operations and operations grouped in families. Non-anticipatory family setup times are held at the beginning of each batch, defined by the combination of one setup-time and a sequence of operations from a unique family. Other aspects are also considered in the problem, such as release dates for operations and machines, operation's sizes, and machine's eligibility and capacity. We consider item availability to define the completion times of the operations within the batches, to minimize the total weighted completion time of jobs. We developed Iterated Greedy (IG) algorithms combining destroy and repair operators with a Random Variable Neighborhood Descent (RVND) local search procedure, using four neighborhood structures to solve the problem. The best algorithm variant outperforms the current literature methods for the problem, in terms of average deviation for the best solutions and computational times, in a known benchmark set of 72 instances. New upper bounds are also provided for some instances within this set. Besides, computational experiments are conducted to evaluate the proposed methods' performance in a more challenging set of instances introduced in this work. Two IG variants using a greedy repair operator showed superior performance with more than 70% of the best solutions found uniquely by these variants. Despite the simplicity, the method using the most common destruction and repair operators presented the best results in different evaluated criteria, highlighting its potential and applicability in solving a complex machine scheduling problem.