Researcher profile

Davi Mecler

Davi Mecler contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 11 - UnverifiedVerification L1Unclaimed author
1works
0followers
1topics
3close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2021arXiv

Iterated Greedy Algorithms for a Complex Parallel Machine Scheduling Problem

This paper addresses a complex parallel machine scheduling problem with jobs divided into operations and operations grouped in families. Non-anticipatory family setup times are held at the beginning of each batch, defined by the combination of one setup-time and a sequence of operations from a unique family. Other aspects are also considered in the problem, such as release dates for operations and machines, operation's sizes, and machine's eligibility and capacity. We consider item availability to define the completion times of the operations within the batches, to minimize the total weighted completion time of jobs. We developed Iterated Greedy (IG) algorithms combining destroy and repair operators with a Random Variable Neighborhood Descent (RVND) local search procedure, using four neighborhood structures to solve the problem. The best algorithm variant outperforms the current literature methods for the problem, in terms of average deviation for the best solutions and computational times, in a known benchmark set of 72 instances. New upper bounds are also provided for some instances within this set. Besides, computational experiments are conducted to evaluate the proposed methods' performance in a more challenging set of instances introduced in this work. Two IG variants using a greedy repair operator showed superior performance with more than 70% of the best solutions found uniquely by these variants. Despite the simplicity, the method using the most common destruction and repair operators presented the best results in different evaluated criteria, highlighting its potential and applicability in solving a complex machine scheduling problem.