Source author record

Cheng-Yang Tan

Cheng-Yang Tan appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

preprint2014arXiv

Instrumentation Developments and Beam Studies for the Fermilab Proton Improvement Plan LINAC Upgrade and New RFQ Front-End

Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton source through 2025. The first phase of the PIP will enable the Fermilab proton source to deliver 1.8e17 protons per hour by mid-2013. As part of this initial upgrade, Fermilab plans to install a new front-end consisting of dual H- ion sources and a 201 MHz pulsed RFQ. This paper will present beam studies measurements of this new front-end and discuss new beam instrumentation upgrades for the Fermilab linac.