Source author record

C. C. Jensen

C. C. Jensen appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
1topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

A 300 kA Pulsed Power Supply for LBNF

The Long Baseline Neutrino Facility (LBNF) will produce the worlds most intense neutrino beam. Three series connected magnetic horns will require 5kV, 300kA, 800$μ$s pulses at a rate of 0.7Hz to focus the beam. Fermilab has designed and built pulsed high current supplies for horns in the past. Pulsed currents of 205 kA for Neutrinos at Main Injector (NuMI - NOvA), focusing a 120 GeV beam, and 170 kA for Booster Neutrino Beam (BNB - MiniBooNE) for focusing an 8 GeV beam have been operational for about 18 years. While the magnetic horns are expected to be replaced, the LBNF horn power supply is expected to last the lifetime of the project, 30 years. A resonant, half sine wave pulser was used for NuMI and BNB and has many practical advantages. The system has impedance limited fault currents by design, albeit large ones. That along with the resonant behavior means that thyristor switches are well suited. Many fault modes of the system have also been calculated. Several circuit changes were incorporated so that a single fault can be tolerated. The supply must be reversable to enable both neutrinos and anti-neutrinos to be produced. These reversal requirements required a significant amount of mechanical design and consideration to allow for quick reversal of all the semiconductors.

preprint2012arXiv

A gap clearing kicker for Main Injector

Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.