Researcher profile

Bosong Li

Bosong Li contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

Cyber-Physical Attack Leveraging Subsynchronous Resonance

This paper discusses how a cyber attack could take advantage of torsional resonances in the shaft of turbo-generators to inflict severe physical damage to a power system. If attackers were able to take over the control of a battery energy storage device, they could modulate the injection of this device at a frequency that matches one of the sub-synchronous resonance frequencies of a generator. Small changes in injection might be sufficient to excite one of these mechanical resonances, resulting in metal fatigue and ultimately a catastrophic failure in the shaft of the generator. Using a state-space model of the electromechanical system, the paper develops transfer functions linking the magnitude of the malicious injections to the magnitude of oscillations in the speed and angle of the various masses connected to the shaft. Numerical results from a two-area power system demonstrate the existence of vulnerable frequencies and show that damaging mechanical oscillations can be triggered without causing easily detectable signals at the generator terminals.

preprint2020arXiv

Hydrothermal Scheduling in the Continuous-Time Framework

Continuous-time optimization models have successfully been used to capture the impact of ramping limitations in power systems. In this paper, the continuous-time framework is adapted to model flexible hydropower resources interacting with slow-ramping thermal generators to minimize the hydrothermal system cost of operation. To accurately represent the non-linear hydropower production function with forbidden production zones, binary variables must be used when linearizing the discharge variables and the continuity constraints on individual hydropower units must be relaxed. To demonstrate the performance of the proposed continuous-time hydrothermal model, a small-scale case study of a hydropower area connected to a thermal area through a controllable high-voltage direct current (HVDC) cable is presented. Results show how the flexibility of the hydropower can reduce the need for ramping by thermal units triggered by intermittent renewable power generation. A reduction of 34% of the structural imbalances in the system is achieved by using the continuous-time model.