Researcher profile

Beste Basciftci

Beste Basciftci contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 15 - UnverifiedVerification L1Unclaimed author
3works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

3 published item(s)

preprint2022arXiv

A Joint Chance-Constrained Stochastic Programming Approach for the Integrated Predictive Maintenance and Operations Scheduling Problem in Power Systems

Maintenance planning plays a key role in power system operations under uncertainty by helping system operators ensure a reliable and secure power grid. This paper studies a short-term condition-based integrated maintenance planning with operations scheduling problem while considering the unexpected failure possibilities of generators as well as transmission lines. We formulate this problem as a two-stage stochastic mixed-integer program with failure scenarios sampled from the sensor-driven remaining lifetime distributions of the individual system elements whereas a joint chance-constraint consisting of Poisson Binomial random variables is introduced to account for failure risks. Because of its intractability, we develop a cutting-plane method to obtain an exact reformulation of the joint chance-constraint by proposing a separation subroutine and deriving stronger cuts as part of this procedure. To solve large-scale instances, we derive a second-order cone programming based safe approximation of this constraint. Furthermore, we propose a decomposition-based algorithm implemented in parallel fashion for solving the resulting stochastic program, by exploiting the features of the integer L-shaped method and the special structure of the maintenance and operations scheduling problem to derive stronger optimality cuts. We further present preprocessing steps over transmission line flow constraints to identify redundancies. To illustrate the computational performance and efficiency of our algorithm compared to more conventional maintenance approaches, we design a computational study focusing on a weekly plan with daily maintenance and hourly operational decisions involving detailed unit commitment subproblems. Our computational results on various IEEE instances demonstrate the computational efficiency of the proposed approach with reliable and cost-effective maintenance and operational schedules.

preprint2022arXiv

Resource Distribution Under Spatiotemporal Uncertainty of Disease Spread: Stochastic versus Robust Approaches

We consider the problem of optimizing locations of distribution centers (DCs) and plans for distributing resources such as test kits and vaccines, under spatiotemporal uncertainties of disease spread and demand for the resources. We aim to balance the operational cost (including costs of deploying facilities, shipping, and storage) and quality of service (reflected by demand coverage), while ensuring equity and fairness of resource distribution across multiple populations. We compare a sample-based stochastic programming (SP) approach with a distributionally robust optimization (DRO) approach using a moment-based ambiguity set. Numerical studies are conducted on instances of distributing COVID-19 vaccines in the United States and test kits, to compare SP and DRO models with a deterministic formulation using estimated demand and with the current resource distribution plans implemented in the US. We demonstrate the results over distinct phases of the pandemic to estimate the cost and speed of resource distribution depending on scale and coverage, and show the ``demand-driven'' properties of the SP and DRO solutions. Our results further indicate that if the worst-case unmet demand is prioritized, then the DRO approach is preferred despite of its higher overall cost. Nevertheless, the SP approach can provide an intermediate plan under budgetary restrictions without significant compromises in demand coverage.

preprint2020arXiv

Distributionally Robust Facility Location Problem under Decision-dependent Stochastic Demand

Facility location decisions significantly impact customer behavior and consequently the resulting demand in a wide range of businesses. Furthermore, sequentially realized uncertain demand enforces strategically determining locations under partial information. To address these issues, we study a facility location problem where the distribution of customer demand is dependent on location decisions. We represent moment information of stochastic demand as a piecewise linear function of facility-location decisions. Then, we propose a decision-dependent distributionally robust optimization model, and develop its exact mixed-integer linear programming reformulation. We further derive valid inequalities to strengthen the formulation. We conduct an extensive computational study, in which we compare our model with the existing (decision-independent) stochastic and robust models. Our results demonstrate superior performance of the proposed approach with remarkable improvement in profit and quality of service by extensively testing problem characteristics, in addition to computational speed-ups due to the formulation enhancements. These results draw attention to the need of considering the impact of location decisions on customer demand within this strategic-level planning problem.