Source author record

Bakhtiyar Farayev

Bakhtiyar Farayev appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

1works
4topics
2close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

1 published item(s)

preprint2015arXiv

Optimal Power Control and Rate Adaptation for Ultra-Reliable M2M Control Applications

The main challenge of ultra-reliable machine-to-machine (M2M) control applications is to meet the stringent timing and reliability requirements of control systems, despite the adverse properties of wireless communication for delay and packet errors, and limited battery resources of the sensor nodes. Since the transmission delay and energy consumption of a sensor node are determined by the transmission power and rate of that sensor node and the concurrently transmitting nodes, the transmission schedule should be optimized jointly with the transmission power and rate of the sensor nodes. Previously, it has been shown that the optimization of power control and rate adaptation for each node subset can be separately formulated, solved and then used in the scheduling algorithm in the optimal solution of the joint optimization of power control, rate adaptation and scheduling problem. However, the power control and rate adaptation problem has been only formulated and solved for continuous rate transmission model, in which Shannon's capacity formulation for an Additive White Gaussian Noise (AWGN) wireless channel is used in the calculation of the maximum achievable rate as a function of Signal-to-Interference-plus-Noise Ratio (SINR). In this paper, we formulate the power control and rate adaptation problem with the objective of minimizing the time required for the concurrent transmission of a set of sensor nodes while satisfying their transmission delay, reliability and energy consumption requirements based on the more realistic discrete rate transmission model, in which only a finite set of transmit rates are supported. We propose a polynomial time algorithm to solve this problem and prove the optimality of the proposed algorithm. We then combine it with the previously proposed scheduling algorithms and demonstrate its close to optimal performance via extensive simulations.