Source author record

B. Szybinski

B. Szybinski appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

4works
3topics
4close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

4 published item(s)

preprint2022arXiv

The European Spallation Source neutrino Super Beam

In this Snowmass 2021 white paper, we summarise the Conceptual Design of the European Spallation Source neutrino Super Beam (ESSvSB) experiment and its synergies with the possible future muon based facilities, e.g. a Low Energy nuSTORM and the Muon Collider. The ESSvSB will benefit from the high power, 5 MW, of the European Spallation Source (ESS) LINAC in Lund-Sweden to produce the world most intense neutrino beam, enabling measurements to be made at the second oscillation maximum. Assuming a ten-year exposure, physics simulations show that the CP-invariance violation can be established with a significance of 5 sigma over more than 70% of all values of delta CP and with an error in the measurement of the delta CP angle of less than 8 degree for all values of delta CP. However, several technological and physics challenges must be further studied before achieving a final Technical Design. Measuring at the 2nd oscillation maximum necessitates a very intense neutrino beam with the appropriate energy. For this, the ESS proton beam LINAC, which is designed to produce the world's most intense neutron beam, will need to be upgraded to 10 MW power, 2.5 GeV energy and 28 Hz beam pulse repetition rate. An accumulator ring will be required for the compression of the ESS LINAC beam pulse from 2.86 ms to 1.3 mus. A high power target station facility will be needed to produce a well-focused intense (super) mu-neutrino beam. The physics performance of that neutrino Super Beam in conjunction with a megaton underground Water Cherenkov neutrino far detector installed at a distance of either 360 km or 540 km from the ESS, the baseline, has been evaluated.

preprint2013arXiv

SuperB Technical Design Report

In this Technical Design Report (TDR) we describe the SuperB detector that was to be installed on the SuperB e+e- high luminosity collider. The SuperB asymmetric collider, which was to be constructed on the Tor Vergata campus near the INFN Frascati National Laboratory, was designed to operate both at the Upsilon(4S) center-of-mass energy with a luminosity of 10^{36} cm^{-2}s^{-1} and at the tau/charm production threshold with a luminosity of 10^{35} cm^{-2}s^{-1}. This high luminosity, producing a data sample about a factor 100 larger than present B Factories, would allow investigation of new physics effects in rare decays, CP Violation and Lepton Flavour Violation. This document details the detector design presented in the Conceptual Design Report (CDR) in 2007. The R&D and engineering studies performed to arrive at the full detector design are described, and an updated cost estimate is presented. A combination of a more realistic cost estimates and the unavailability of funds due of the global economic climate led to a formal cancelation of the project on Nov 27, 2012.

preprint2013arXiv

The EUROnu Project

The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Fréjus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of μ+ and μ- beams in a storage ring. The far detector in this case is a 100 kt Magnetised Iron Neutrino Detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular 6He and 18Ne, also stored in a ring. The far detector is also the MEMPHYS detector in the Fréjus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive.

preprint2012arXiv

The SPL-based Neutrino Super Beam

The EUROnu Super Beam work package has studied a neutrino beam based on SPL at CERN and aimed at MEMPHYS, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane (Fréjus tunnel, France), with a baseline of 130 km. The aim of this proposed experiment is to study the CP violation in the neutrino sector. In the study reported here, we have developed the conceptual design of the neutrino beam, especially the target and the magnetic focusing device. Indeed, this beam present several unprecedented challenges, like the high primary proton beam power (4 MW), the high repetition rate (50 Hz) and the low energy of the protons (4.5 GeV). The design is completed by a study of all the main component of the system, starting from the transport system to guide the beam to the target up to the beam dump.