Researcher profile

B. Kalantari

B. Kalantari contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - Baseline
2works
0followers
1topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2016arXiv

Commissioning experience and beam physics measurements at the SwissFEL Injector Test Facility

The SwissFEL Injector Test Facility operated at the Paul Scherrer Institute between 2010 and 2014, serving as a pilot plant and testbed for the development and realization of SwissFEL, the X-ray Free-Electron Laser facility under construction at the same institute. The test facility consisted of a laser-driven rf electron gun followed by an S-band booster linac, a magnetic bunch compression chicane and a diagnostic section including a transverse deflecting rf cavity. It delivered electron bunches of up to 200 pC charge and up to 250 MeV beam energy at a repetition rate of 10 Hz. The measurements performed at the test facility not only demonstrated the beam parameters required to drive the first stage of an FEL facility, but also led to significant advances in instrumentation technologies, beam characterization methods and the generation, transport and compression of ultra-low-emittance beams. We give a comprehensive overview of the commissioning experience of the principal subsystems and the beam physics measurements performed during the operation of the test facility, including the results of the test of an in-vacuum undulator prototype generating radiation in the vacuum ultraviolet and optical range.

preprint2002arXiv

Insertion Device Controls at the Swiss Light Source

In the initial phase of the Swiss Light Source, four insertion devices will be installed. The control system for all the ID's follows an uniform concept to allow a rapid installation schedule, while at the same time allowing for a variety in operational requirements. The components of the control system include the gap drive system with encoders, temperature monitoring, beam position monitoring, power supply controllers for corrector magnets [1] and a timing module [2]. The gap drive system requirements range from micron-level accuracy to driving double undulators in synchronism with each other and also with the other beamline elements. The local synchronism is achieved with a tightly coupled system having an intelligent motor controller and the global synchronism by extending the machine timing distribution to the insertion devices and the beamlines with the capability to add beamline-specific timing events. [1] A.Luedeke et.al.,'Digital Power supplies for the Swiss Light Source', these proceedings