Source author record

Arthur Kramer

Arthur Kramer appears in the imported research catalog. Authorship, coauthor and topic links are available while profile ownership is still unclaimed.

ResearcherUnclaimed source record

Catalog footprint

What is connected

2works
2topics
3close collaborators

Actions

Connect this record

Log in to claim

Research graph

See the researcher in context

Open full explorer

Inspect adjacent papers, topics, institutions and collaborators without losing the researcher page.

Building this map preview

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2020arXiv

Scheduling jobs with release dates on identical parallel machines by minimizing the total weighted completion time

This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum w_jC_j$, is of great importance in practice, because it models a variety of real-life applications. Despite its importance, the $P|r_j|\sum w_jC_j$ has not received much attention in the recent literature. In this work, we fill this gap by proposing mixed integer linear programs and a tailored branch-and-price algorithm. Our {branch-and-price} relies on the decomposition of an arc-flow formulation and on the use of efficient exact and heuristic methods for solving the pricing subproblem. Computational experiments carried out on a set of randomly generated instances prove that the proposed methods can solve to the proven optimality instances with up to 200 jobs and 10 machines, and provide very low gaps for larger instances.

preprint2018arXiv

Enhanced arc-flow formulations to minimize weighted completion time on identical parallel machines

We consider the problem of scheduling a set of jobs on a set of identical parallel machines, with the aim of minimizing the total weighted completion time. The problem has been solved in the literature with a number of mathematical formulations, some of which require the implementation of tailored branch-and-price methods. In our work, we solve the problem instead by means of new arc-flow formulations, by first representing it on a capacitated network and then invoking a mixed integer linear model with a pseudo-polynomial number of variables and constraints. According to our computational tests, existing formulations from the literature can solve to proven optimality benchmark instances with up to 100 jobs, whereas our most performing arc-flow formulation solves all instances with up to 400 jobs and provides very low gap for larger instances with up to 1000 jobs.