Researcher profile

Andrey Belyaev

Andrey Belyaev contributes to research discovery and scholarly infrastructure.

ResearcherAffiliation not importedOpen to collaborate

Trust snapshot

Quick read

Trust 13 - UnverifiedVerification L1Unclaimed author
2works
0followers
3topics
4close collaborators

Actions

Decide how to stay connected

Follow researcher0

Identity and collaboration

How to connect with this researcher

Claiming links this public author record to a researcher profile and unlocks direct collaboration workflows.

Log in to claim

Direct collaboration

Open a focused conversation when the fit is right

Claim this author entity first to unlock direct invitations.

Research graph

See the researcher in context

Open full explorer

Inspect adjacent work, topics, institutions and collaborators without jumping out to a separate graph page.

Building this graph slice

BZPEER is loading the nearby papers, people, topics and institutions for this page.

Published work

2 published item(s)

preprint2022arXiv

Analysis of Mission Opportunities to Sedna in 2029-2034

The article focuses on trajectory design to the trans-Neptunian object (90377) Sedna for launch in 2029-2034. Sedna is currently moving to the perihelion at a distance of around 74 au from the Sun. The perihelion passage is estimated to be in 2073-74. That opens up of opportunities to study such a distant object. Known for its orbit and 10 thousand year period, Sedna is an exciting object for deep space exploration. The current research provides two possible scenarios of transfer to Sedna. A direct flight and flights including gravity assist manoeuvres are considered. The present study showed that a direct flight would be practically unrealistic due to the high total characteristic velocity and the time of flight value. Promising scenarios include gravity assist manoeuvres near Venus, Earth, Jupiter, Saturn and Neptune. The analysis of the close approach to asteroids during the flight to Sedna had been performed. Results of the research presented in this article show that the launch in 2029 provides the best transfer conditions in terms of minimum total characteristic velocity. The analysis shows that with a small additional impulses flybys of the large main-belt asteroids (16) Psyche for launch in 2034 and (20) Massalia for launch in 2029 are possible.

preprint2022arXiv

Expansion of landing areas on the Venus surface using resonant orbits in the Venera-D project

A problem of determining attainable landing sites on the surface of Venus is an essential part of the Venera-D project aimed to explore the planet using a lander. This problem appears due to the inability for the descent module to land at any point on the surface of Venus because of the short duration of the launch window (about 2 weeks from the optimal launch date), as well as restrictions on the maximum permissible overload. An additional factor affecting the reduction of attainable landing sites is the low angular velocity of Venus own rotation. This study proposes a new approach to expand the attainable landing areas. The approach is based on the use of the gravitational field of Venus to transfer the spacecraft to an orbit resonant to the Venusian one with a ratio of periods of 1:1. All the simulations were performed at the patched conic approximation. As an example, we considered a flight to Venus at launch in 2029 or 2031. For both cases maps of attainable landing areas on the surface were constructed. It has been demonstrated that there is always at least one launch date within the launch window, allowing the spacecraft to reach almost any point on the surface of Venus. It is shown that the application of the proposed approach makes it possible to achieve a significant expansion of the attainable landing areas (over 70\% of the surface) and, in some cases, provide access to any point on the surface of Venus. However, the price of this advantage is an increase in the flight duration by one Venusian year.